PREPARING THE NEW LOCATION
The following 1990 images show a property being readied in preparation
for the dopot's next, and final, move.
Roger Cammack digs a trench for the floor footing before
for floor can be poured.
Pouring the first concrete for the footings.
Kirk Sogard is seen working the concrete truck.
Keep that concrete footing cool, so it will harden well and be very
sturdy!
A frame is constructed in preparation to pouring the
concrete floor for the depot's new location.
The framing of the floor is accomplished, and when
the truck gets here, concrete will be poured.
The concrete depot floor is being poured.
Spreading out the freshly poured concrete
Alan Staples is finishing the surface of the new floor.
Neighborhood kids (Brain Egeland, Kent Spohnheimer
and Tasha Staples)
celebrate the day's accomplishments.
Next Page (Depot 3B)