The Depot in the 1980s - Page 8C |
The following images show a property being readied in preparation for the dopot's next, and final, move. Roger Cammack digs a trench for the floor footing before for floor can be poured. Pouring the first concrete for the footings. Kirk Sogard is seen working the concrete truck. Keep that concrete footing cool, so it will harden well and be very sturdy! A frame is constructed in preparation to pouring the concrete floor at the depot's new location. The framing of the floor is accomplished, and when the truck gets here, concrete will get poured. The concrete depot floor is being poured. Spreading out the freshly poured concrete Alan Staples is finishing the surface of the new floor. Neighborhood kids (Brian Egeland, Kent Spohnheimer and Tasha Staples)
celebrate the day's accomplishments.